The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Outside Is Where We Thrive – Summer

November 1993 Issue

Twenty Month Lift Replacement

Over the past 10 years, there have been dramatic changes in the environmental approval process. Nowhere is this more apparent than in the replacement of the Magic Mile chairlift at Timberline Ski Area in Oregon, where extreme measures were required to secure vital environmental approvals.

During the winter of 1991, Timberline announced plans to replace the Magic Mile double chair, built in 1961, with a detachable quad. While the proposal did not call for changing the length of the 5,500-foot-long lift, the uphill capacity was increased from 810 to 2,800 people per hour. This chairlift is an integral component of both the winter and summer skiing operations, providing round-trip skiing on the upper mountain in the winter and access to the Palmer chair on a snowfield during the summer. In light of previous appeals and litigation involving ski-facility development at Timberline and nearby Mt. Hood Meadows, the U.S. Forest Service decided at the outset that a National Environmental Policy Act document would be required to analyze the impacts of the lift replacement.

A public scoping process identified a number of important issues in the areas of transportation, plants, wildlife, visual resources, cultural resources/ethnography and socioeconomics. Results of the scoping process, which included meetings with Native American tribal organizations, environmental groups, governmental agencies and concerned public, provided the basis for deciding that an Environmental Assessment (EA) must be prepared. With input from the Forest Service resource specialists, the consultants prepared a plan of study addressing issues of concern.

Advertisement

Prinoth Snow Measurement - Billboard