The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Commerce B - Leaderboard

January 2026 Issue

Idea Files :: January 2026

An all-Canada edition with a custom Panther mixer; hands-free water stations; and a downspout boot dryer.

Idea Files Castle

Idea Files Castle

Castle Mountain, Alberta, installed a high-speed quad chairlift this past summer to serve what was previously a cat-skiing zone. It was the biggest project in the area’s history. Moving concrete up the mountain to pour tower footings presented challenges, among them narrow work roads that concrete-truck drivers were hesitant to drive. Project manager Katherine Seleski needed a solution. Castle had rented several Prinoth Panther T8 tracked vehicles for the project, so Seleski, having seen a tracked vehicle with a concrete mixer on the back before, sought out a right-sized, skid-mounted mixer to retrofit to the flatbed of one of the Panthers. She found “the last one in North America (I swear, I called everyone),” from Ready Mixer in West Virginia. With the rental company’s blessing, the Castle team welded attachments to a Panther T8’s deck and mounted the mixer, which allowed them to deliver concrete via the tight roads. The solution, while not perfect or fast, said Seleski, saved Castle $300,000 to $450,000 in helicopter transport costs and allowed them to pour in any weather. 

Sign in or enable JavaScript to keep reading.

Advertisement

Prinoth Snow Measurement - Billboard