The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Mountains Don’t Move Themselves

September 2017 Issue

Construction Site :: September 2017

Lift upgrades, lodge expansions, and mountain bike projects are underway at resorts across North America.

Snow Valley, CA

SNOW VALLEY, CA

sep17 c site 01Snow Valley is investing more than $5 million to build SoCal’s first detachable six-pack leading up to the resort’s 80th anniversary season. The Leitner-Poma product will have 72 carriers to transport 2,600 riders an hour over its 4,635-foot length, more than double the capacity of the 1,200 per hour of the 1973 Lift Engineering double it replaces. The ride will take 4.6 minutes, as opposed to 14 minutes for the old lift. The six-pack has an AC top drive with bottom tension; power comes from a 500 hp motor. Two 300-hp diesel backup engines provide backup power. Construction began in May, and is on schedule for a December opening. In early August, the resort completed the removal of the old lift, which involved use of a 25-ton crane to grab the 50,000-pound top terminal in one pick, and began pouring foundations for the new lift. “This lift will have a huge impact on our visitation,” said Snow Valley VP and GM Kevin Somes. “We’ve already seen a jump in season pass sales.” This year’s investments follow the more than $1 million spent a year ago on increased snowmaking and an updated rental shop.

Sign in or enable JavaScript to keep reading.

Advertisement

Prinoth Snow Measurement - Billboard