The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Mountains Don’t Move Themselves

November 1992 Issue

The Wherefores Of Wire Rope

In Right Regular Lay rope (left), strands are right layed and the wires in the strands are left layed. In Right Lang Lay rope (right), strands are right layed and the wires in the strands are also right layed.

Wire rope installation is a topic that provokes a wide range of opinions and brings about differing responses from lift manufacturers, wire rope manufacturers as well as the field installers. Opinion is split on a preferred method of wire rope installation, so the method often used is the one that is the fastest and with the least amount of installation problems. What are the long range effects after dynamic forces have had a chance to work on your new wire rope? Should an anti-twist device or “monkey tail” be attached on the lead end of the rope near the stringing splice to prevent the rope from rotating, which may add an extra day or two to the stringing process, or do we let it run around without retaining the twist?

Where does the ski industry’s “smoking finger of blame” land when things go wrong after a season of operating time has been put on an area’s new rope and they begin to experience leaning, swinging chairs, excessive chair slippage, as well as loose and breaking wires ahead of the chair grips? Who gets the blame when splice problems occur with loose and breaking wires near the tucks and in the outer wires of the strands throughout the splice area?

Advertisement

Climb Zip Whip Leaderboard