Critical path scheduling diagram showing activity nodes 1 to 6 connected by arrows labeled with durations

All successful ski areas, large and small, are involved in ongoing capital and operational planning. Whether we’re talking about a new marketing approach, construction of new lift facilities or determining the summer projects for the carpenter, most activities need a plan if they are going to be implemented in an efficient manner. One technique that is available to ski area managers, but used too infrequently, is critical path scheduling.

Critical path scheduling also known as network modeling has been around since the late 1950’s. PERT (Program Evaluation and Review Technique) was established by the Navy as a planning tool for the Polaris missile project. Much of the Polaris success was attributed to PERT and it became a significant planning tool for many large-scale government projects. CPM or Critical Path Method was developed by the DuPont Company to plan maintenance at their chemical plants located worldwide. Although named differently, the two techniques are almost identical in concept and methodology.

Advertisement

Creative Design Billboard