The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Creative Designs Leaderboard

September 2004 Issue

Construction Site

New Alpine slide tracks being installed on a hillside at Park City

Park City Mountain Resort, Utah

Park City had two of the oldest Alpine slides currently operating in the U.S., installed in 1977. With the slides becoming increasingly popular, the resort decided to double capacity by adding two new lanes. These cover the same length, 2,750 feet, and vertical, 550 feet, but reflect advances in the Alpine Slide business: The old lanes are made of lightweight concrete; the new ones of fiberglass. The materials change has led to other innovations: the new lanes have more swooping, high-banked turns, like on a race track. The older track feels more “wiggly,” says project manager Tom Pettigrew; the new track, more of a superhighway feel. Although the new lanes are adjacent to the old tracks, the installation was anything but simple. The site is not easily accessible by vehicle, and preparing the roadbed was complicated. “It’s no different than building a two-lane road in a remote area,” Pettigrew says. Crews encountered deep topsoil, which was removed and replaced with more solid fill. Several dips and valleys in the line were filled as well. Once the bed was done, though, the track itself was installed in 19 days. Revegetation of the surrounding hillside required hydroseeding and, since the slope was 20 percent or more in places, tackifiers were added to the mulch to help it adhere to the hillside. The track debuted July 23, ahead of schedule and on budget, and has provided the increase in capacity that the resort sought—the four slides can handle 600 riders an hour. Park City also doubled capacity on its Ziprider, the nation’s only such ride at press time (though others are under development).

Advertisement

Creative Design Billboard