July 1997 Issue

Putting Sheaves in Their Place

A Bombardier BR 400 and a Muskeg tracked vehicle working beneath a chairlift tower
A Bombardier BR 400 and a Muskeg tracked vehicle working beneath a chairlift tower
The Bombardier BR 400 (left) fed cable through slings and pulleys attached to the tower to lower a sheave assembly onto a Muskeg (right), which transported it to the cleaning crews in the maintenance garage.

In the spring of 1996, the lift maintenance crew at Tremblant, Que., faced a huge challenge: overhauling the sheave assemblies on all 32 towers of an 8,250-feet-long bubble quad. Because this lift ran close to 3,000 hours a year and had reached 20,000 hours of operation, it was due for a major overhaul. But several constraints made the job complicated: time, equipment, tooling and spare parts.