The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Run Smarter Banner

Summer 1979 Issue

Load Testing

The Ski Area Management Winter 1975 issue contained a frequently-referenced article on post-construction load testing of aerial lift facilities. It enumerated prerequisites of load testing, preparations for testing, test procedures, and dangers associated with improper test conditions and practices. Generally, these steps for load testing of aerial tramway and lift facilities have gone well and the test results have been properly documented and used.

Occasionally, however, a second look is in order, because complacency can develop with the routine procedures involved. Interest has waned as apprehensiveness associated with the unique experience of early tests has passed. The importance of the test and its relevance to all parties concerned are overlooked. Sadly, on occasion, the tests are regarded as merely a nuisance requirement of authorities having jurisdiction and insurance interests that must be met.

More From This Issue

Advertisement

MDMT – Card

Advertisement

Prinoth Snow Measurement - Billboard