The Voice of the Mountain Resort Industry  |  Est. 1962

Advertisement

Creative Designs Leaderboard

Summer 1972 Issue

Eyeballing Your Liftline

FIGURE 1—With this self-checking survey method, two sets of readings are made for each course. Control points are set 100-200 feet apart.

The accuracy of the original survey of a liftline is extremely important as the profile plotted from the survey forms the basis from which the lift is designed. If an undetected error is made in the survey, the rope deflections, the ground clearances and the tower roller loadings will not coincide with the design, and the lift may be unacceptable or even dangerous.

The number of surveying errors over the years, in fact, has been of enough concern to warrant government action. Several years ago in Canada, for instance, the British Columbia Department of Commercial Transport found an error of nearly 10 feet in elevation on an area chairlift. Alarmed over the potential danger of the lift, they insisted that all future survey methods be self-checking and that a copy of the surveying notes be filed with their office. Furthermore, they required that an “as built” survey be made of each lift to check not only the original survey but the construction surveying as well.

Advertisement

MDMT – Card

Advertisement

Pro Deals Billboard